Welcome to your FP103 Quiz Enter your name Enter your email address 1. Penetrations in fire rated assemblies must follow: Engineering judgements Caulk and walk Approved fire stop system The contractors decision None 2. 5/8" type x gypsum board gives a 1 hour rating. True False None 3. A 2 hour protected beam penetrates a 2 hour rated wall. The arrangement is: Acceptable since the rating of the beam is equal to that of an assembly Not allowed That the beam must be considered as a penetration item Only okay if that wall is CMU None 4. The top track of the rated wall is not part of the assembly and can be cut out to put cables. True False None 5. Engineering judgement's are valid: As long as it is stamped by a professional engineer When approved by AHJ When approved by the contractor Always None 6. Screw spacing needed to secure the gypsum board as part of the assembly must be: No more than 12" o.c. No more than 24" o.c. Matched specified by manufacturer Left up to the contractor None 7. Shaft wall assembly: Must be built from both sides Must be used where it is hard to achieve construction from both side Does not need to be listed Must consist of CMU wall construction None 8. Which statement is true? A fire wall is a fire barrier A fire barrier is a fire wall A fire partition is a fire barrier Any wall that prevents passage of smoke is a fire wall None 9. As long as the fire assembly is sealed by a professional engineer, it is approved. True False None 10. Joints consist of sealant and mineral will. True False None Time's up